Once all the wiring was complete, the base is bolted back on, and the pneumatic pipes connected.
A couple of turns of PTFE tape seal the threads around the wax injector nozzle and temperature gauge.
First run - up to temperature and holding fine at just below 65 deg C.
And pressure holding at 12.5 PSI, ready for some tests!
Bookmarks